Green sand lines
Sand property control, mold quality scoring, auto-pour control and shakeout timing on high-volume moving lines.
Ferrous and non-ferrous. Sand, die, permanent-mold and investment casting. Automotive, energy, aerospace, fluid power and structural components. The loop is the same; the models, windows and evidence are yours.
Built with foundries and die casters melting iron, steel, aluminium, magnesium and copper
[PLACEHOLDER] Design-partner names are illustrative until first references are signed.
The physics differ. The loop does not: perceive the process, plan against the twin, act inside a window, verify with inspection, log, retrain.
Sand property control, mold quality scoring, auto-pour control and shakeout timing on high-volume moving lines.
Shot parameters, cure and core strength controlled per core box, with dimensional verification tied to the finished part.
Moving-line takt balanced against furnace readiness, mold readiness and inspection throughput.
Shot profile, intensification and die thermal control against predicted porosity, with vacuum and spray parameters in the loop.
Fill pressure profiles, die temperature and cycle control tuned to soundness rather than cycle time alone.
Large structural aluminium parts where a single reject destroys hours of value and X-ray triage is the bottleneck.
Shell integrity, preheat and pour temperature control for thin-wall and single-crystal-adjacent work.
AS9100 and NADCAP-aware genealogy, first-article evidence and non-conformance handling built in.
CT batch triage as the primary verdict for safety-critical parts, with root cause pushed back to shell and pour.
Hydrogen and inclusion control, degassing verification and shrinkage prediction for lightweighting programs.
Tight thermal and safety envelopes with handling and cover-gas conditions inside the control loop.
Chemistry and pour-temperature control for pump bodies, fittings and electrical components.
The economic buyer owns production rate, quality, scrap and yield, and safety. They want autonomous, higher-yield, higher-quality casting — and a number that clears a 6–12 month payback on a $15k/month cell.
Engine blocks, crankshafts, structural nodes and EV megacastings, where lightweighting and structural casting volume are growing faster than the workforce that pours them.
Investment castings under AS9100 and NADCAP where CT is the verdict and a field escape is unthinkable.
Turbine housings, pump bodies and pressure-bearing parts that must hold for decades without a hidden pore or crack.
Valve bodies, fittings and hydraulic components produced at volume, where scrap and rework quietly consume the margin.
Structural nodes and pipe fittings that carry stress and pressure for decades under public-safety expectations.
Repeat-production foundries with enough casting value in one cell to make the wedge ROI obvious in a single quarter.
We qualify hard, because a pilot that cannot prove ROI wastes a foundry's quarter and ours.
Every engagement starts with one cell and one measurable number. These are the wedges design partners pick most often.
The craft step. Consistency, rate and safety improve together, and misrun and cold-shut scrap falls immediately.
Where inspection is the bottleneck and escapes are the fear. Grade everything, triage in minutes, attribute root cause upstream.
Where energy and heat-to-heat drift dominate. Hold the window, cut melt loss and kWh per tonne.
Where rejects trace back to a batch nobody logged. Control the sand system before it reaches the line.
Where the labour shortage bites hardest and the work is most injurious. Finish hands-free and feed the twin.
$500k–$5M
Annual wedge-cell pain we target
6–12
Month payback on a cell
3–5
Design partners in the first phase
$15k
Monthly landing price per cell
[ASPIRATIONAL] Pilot targets from Smelteon's ICP and pricing model.
Two of our best pourers retire next year. That is the whole business case in one sentence.
We had simulation and we had CT. We had nothing that connected them on the shift that mattered.
Our customer wants genealogy on every casting. Doing that manually is not a plan.
Design-partner voices are illustrative composites of foundry buyer conversations. [PLACEHOLDER — replace with named references after first case studies.]
Tell us which cell costs you the most in scrap, rework, melt loss or inspection backlog, and we will baseline it with you.