Built for theway your plantactually casts.

Ferrous and non-ferrous. Sand, die, permanent-mold and investment casting. Automotive, energy, aerospace, fluid power and structural components. The loop is the same; the models, windows and evidence are yours.

5Casting methods
6Alloy families
$150M–$30BCustomer revenue range

Built with foundries and die casters melting iron, steel, aluminium, magnesium and copper

Ironhaus GroupMeridian CastingsVulcan DuctileAurora Light MetalsKestrel Die CastingNorthfield Foundry Co.

[PLACEHOLDER] Design-partner names are illustrative until first references are signed.

Five methods,one control loop.

The physics differ. The loop does not: perceive the process, plan against the twin, act inside a window, verify with inspection, log, retrain.

Green sand lines

Sand property control, mold quality scoring, auto-pour control and shakeout timing on high-volume moving lines.

Coremaking

Shot parameters, cure and core strength controlled per core box, with dimensional verification tied to the finished part.

Yield and takt

Moving-line takt balanced against furnace readiness, mold readiness and inspection throughput.

Three buyers,three numbers.

01Rate, quality, scrap, safety

The economic buyer owns production rate, quality, scrap and yield, and safety. They want autonomous, higher-yield, higher-quality casting — and a number that clears a 6–12 month payback on a $15k/month cell.

  • Rate that is not capped by pourer availability
  • Scrap and rework off the P&L
  • Escapes that never reach a customer
  • Plant director
  • Metallurgist
  • Quality engineer

Where a hidden poreis unacceptable.

Automotive & EV

Engine blocks, crankshafts, structural nodes and EV megacastings, where lightweighting and structural casting volume are growing faster than the workforce that pours them.

Learn more

Aerospace

Investment castings under AS9100 and NADCAP where CT is the verdict and a field escape is unthinkable.

Learn more

Energy & turbomachinery

Turbine housings, pump bodies and pressure-bearing parts that must hold for decades without a hidden pore or crack.

Learn more

Fluid power & industrial

Valve bodies, fittings and hydraulic components produced at volume, where scrap and rework quietly consume the margin.

Learn more

Structural & infrastructure

Structural nodes and pipe fittings that carry stress and pressure for decades under public-safety expectations.

Learn more

Job shops at volume

Repeat-production foundries with enough casting value in one cell to make the wedge ROI obvious in a single quarter.

Learn more

Who this isbuilt for — andwho it is not.

We qualify hard, because a pilot that cannot prove ROI wastes a foundry's quarter and ours.

  • Sufficient production volume or casting value to make cell ROI obvious
  • Existing melt, molding, pouring, inspection and MES systems with API or OT access
  • Executive mandate to raise yield or cut scrap and melt loss
  • Willingness to run a paid pilot with a defined yield, scrap or porosity success metric

Start where themoney is bleeding.

Every engagement starts with one cell and one measurable number. These are the wedges design partners pick most often.

Robotic pour and fill control

The craft step. Consistency, rate and safety improve together, and misrun and cold-shut scrap falls immediately.

Explore

X-ray / CT porosity detection

Where inspection is the bottleneck and escapes are the fear. Grade everything, triage in minutes, attribute root cause upstream.

Explore

Melt chemistry optimization

Where energy and heat-to-heat drift dominate. Hold the window, cut melt loss and kWh per tonne.

Explore

Sand, mold and core quality

Where rejects trace back to a batch nobody logged. Control the sand system before it reaches the line.

Explore

Robotic fettling and finishing

Where the labour shortage bites hardest and the work is most injurious. Finish hands-free and feed the twin.

Explore

$500k–$5M

Annual wedge-cell pain we target

6–12

Month payback on a cell

3–5

Design partners in the first phase

$15k

Monthly landing price per cell

[ASPIRATIONAL] Pilot targets from Smelteon's ICP and pricing model.

The reasons wehear most.

Two of our best pourers retire next year. That is the whole business case in one sentence.

Operations DirectorFerrous foundry group

We had simulation and we had CT. We had nothing that connected them on the shift that mattered.

Process EngineerAluminium structural castings

Our customer wants genealogy on every casting. Doing that manually is not a plan.

Quality ManagerAutomotive tier one

Design-partner voices are illustrative composites of foundry buyer conversations. [PLACEHOLDER — replace with named references after first case studies.]

Find your wedge.

Tell us which cell costs you the most in scrap, rework, melt loss or inspection backlog, and we will baseline it with you.